Sellwood Middle School

Portland, OR
  • Right Now
  • Power
    Output
    0 w
  • Irradiance
    3 w / m2
  • Temperature
    Cell
    53°F
    Ambient
    55°F
  • Lifetime
  • 1,433 kwh
    2,006 lbs of CO2 Avoided

Weather

Mostly Cloudy at 11:53 am PDT
66 °F/19 °C
Mostly Cloudy at 11:53 am PDT
Wind direction: W
Wind speed: 6 mph

System Specs

6/3/2009
1 kW
30.0°
180.0° from North

System Installer

  • Christenson Electric, Inc.
No Data Available for this time period.
Today, Sellwood Middle School generated 0 Kilowatt-hours of electricity. From fossil-fueled sources, this amount of electricity would have emitted 0 lbs of CO2 into the atmosphere.

This could power:

  • An electric toothbrush for 0 sec
  • A 42" plasma-screen television for 0 sec
  • A typical video game system for 0 sec

Sellwood Middle School installed a 1.36 kilowatt PV system in July of 2009 thanks to support from the Northwest Environmental Defense Center. The program also included a middle school activity guide, science kit and an onsite teacher training.