Kraxberger Middle School
Gladstone, OR
- Right Now
-
PowerOutput17 w
-
Irradiance12 w / m2
-
TemperatureCell58°FAmbient59°F
- Lifetime
-
1,331 kwh1,863 lbs of CO2 Avoided
Weather
55 °F/13 °C
Cloudy at 5:53 pm PDT
Wind direction: E
Wind speed: 9 mph
System Specs
System Installer
-
Mr. Sun Solar
&NBSP
Today, Kraxberger Middle School generated 3 Kilowatt-hours of electricity. From
fossil-fueled sources, this amount of electricity would have emitted 4 lbs of
CO2 into the atmosphere.
This could power:
- An electric toothbrush for 11 weeks
- A 42" plasma-screen television for 6 hours
- A typical video game system for 6 days
The 1.1 kW solar panel project at Kraxberger Middle School is the first renewable energy system at the school. Gladstone High School won the solar panels for the school through the Change-A-Light campaign with Energy Trust of Oregon. Teachers at Kraxberger intend to use the data generated from the project for classroom use. Cloudy days, sunny days and temperature changes will affect the energy output of the solar panels. By conducting experiments using these variables and others, students will be able to learn about solar energy in a hands-on environment.
New Projects
Events
-
8/28
