Encore Ceramics

Project Partners:
BEF

Installer:
David Parker and Associates
Location:
Grants Pass, OR
Capacity:
29 kW
Type of Power:
Solar

Placed into Service:
August 2005

Project Links:

Bonneville Environmental Foundation granted Encore Ceramics a loan to cover the costs of equipment and installation for a 29 kW PV system, the sixth-largest PV system in the Northwest at the time. Encore Ceramics wanted to make a start toward energy self-sufficiency for their company. Currently, the system produces approximately 4 percent of their electrical use. The company hopes to install a bigger PV system on their newest building which was specifically designed to support a 140 kW PV system.

 

 

 
Technical Details

Product Supplied:

Renewable electricity to Encore Ceramics.

Equipment:
  • 176 Sharp 165W panels
  • Ballard inverter

Data Monitoring: Fat Spaniel Technologies Energy Monitoring System

 

 